Dreamscapes Project Galleries

Day 1.  Just a pasture.
Day 1. Just a pasture.

Removal and hauling of 28 pine tree stumps
Removal and hauling of 28 pine tree stumps

Completed!
Completed!

Day 1.  Just a pasture.
Day 1. Just a pasture.

1/13
Horse Arena
Pool Dig
Pool Dig

Pool excavation with pool bottom dug and trued by laser.

Pool Dig
Pool Dig

Pool Finish Work
Pool Finish Work

Area around pool all backfilled with excavator and fine-graded to laser spec.

Pool Dig
Pool Dig

Pool excavation with pool bottom dug and trued by laser.

1/6
Pool Dig
Parking Lot
Parking Lot

Large parking lot repairs and top coat with 2B Limestone.

Driveway
Driveway

Driveway plan painted in customers yard.

Driveway/Yard Work
Driveway/Yard Work

After...

Parking Lot
Parking Lot

Large parking lot repairs and top coat with 2B Limestone.

1/10
Driveways
RV Pad
RV Pad

Initial excavation to base material. Store sod and soil for later use.

RV Pad
RV Pad

Installation of driveway fabric, large sandstone base, and gravel.

RV Pad
RV Pad

RV Pad
RV Pad

Initial excavation to base material. Store sod and soil for later use.

1/8
RV Pad
New Landscape
New Landscape

UniLock retaining walls installed.

New Landscape
New Landscape

High-quality plants with hand-chosen sandstone and Preen pre-treated mulch for a complete weed-free season.

New Landscape
New Landscape

The rock in the middle was specifically chosen as a sitting rock.

New Landscape
New Landscape

UniLock retaining walls installed.

1/6
Landscape Projects
Drain Replacement
Drain Replacement

Cut asphalt to replace existing clogged 6" drain pipe.

Drain Replacement
Drain Replacement

Catch basin hole enlarge to 8" and new pipe tied in.

Backfill completed
Backfill completed

Drain Replacement
Drain Replacement

Cut asphalt to replace existing clogged 6" drain pipe.

1/21
Drainage Work
Hillside Before
Hillside Before

New home with excessive hill on front side. Dozer cut material from back of site, fill in, and grade.

Hillside During
Hillside During

Same hillside after filled and topped with topsoil.

Complete Yard Installation.  All done!
Complete Yard Installation. All done!

Prep sub-surface, remove unwanted growth and old sidewalks, grade and prep 200 yards of screened topsoil and Hydroseed.

Hillside Before
Hillside Before

New home with excessive hill on front side. Dozer cut material from back of site, fill in, and grade.

1/25
Rockhound Finish
Ernst Trail Addition
Ernst Trail Addition

Grading bike trail behind Ainsworth in Meadville. Grade to spec for all access and install culvert pipe.

Ernst Trail Bridge 2019
Ernst Trail Bridge 2019

Piers set previously. Bridge installation day with Lloyd Crane, haf.AST Dirtworks, and the FCRT trail crew.

Ernst Trail Addition
Ernst Trail Addition

Grading bike trail behind Ainsworth in Meadville. Grade to spec for all access and install culvert pipe.

1/8
Earnst Trail Bridge
Building Site Preparation
Building Site Preparation

Future site of the new Tamarack Armory in Meadville, PA.

Building Site Preparation
Building Site Preparation

Tamarack Armory after all site prep and new parking area installed.

Building Floor Raising
Building Floor Raising

Raised the floor 6" in this 300' long building for water improvements. Each load was set at entrance door and pushed inside. Final compaction with roller.

Building Site Preparation
Building Site Preparation

Future site of the new Tamarack Armory in Meadville, PA.

1/12
Building Site Prep