Day 1.  Just a pasture.
Day 1. Just a pasture.

press to zoom
Removal and hauling of 28 pine tree stumps
Removal and hauling of 28 pine tree stumps

press to zoom
Completed!
Completed!

press to zoom
Day 1.  Just a pasture.
Day 1. Just a pasture.

press to zoom
1/13
Horse Arena
Pool Dig
Pool Dig

Pool excavation with pool bottom dug and trued by laser.

press to zoom
Pool Dig
Pool Dig

press to zoom
Pool Finish Work
Pool Finish Work

Area around pool all backfilled with excavator and fine-graded to laser spec.

press to zoom
Pool Dig
Pool Dig

Pool excavation with pool bottom dug and trued by laser.

press to zoom
1/6
Pool Dig
Parking Lot
Parking Lot

Large parking lot repairs and top coat with 2B Limestone.

press to zoom
Driveway
Driveway

Driveway plan painted in customers yard.

press to zoom
Driveway/Yard Work
Driveway/Yard Work

After...

press to zoom
Parking Lot
Parking Lot

Large parking lot repairs and top coat with 2B Limestone.

press to zoom
1/10
Driveways
RV Pad
RV Pad

Initial excavation to base material. Store sod and soil for later use.

press to zoom
RV Pad
RV Pad

Installation of driveway fabric, large sandstone base, and gravel.

press to zoom
RV Pad
RV Pad

press to zoom
RV Pad
RV Pad

Initial excavation to base material. Store sod and soil for later use.

press to zoom
1/8
RV Pad
New Landscape
New Landscape

UniLock retaining walls installed.

press to zoom
New Landscape
New Landscape

High-quality plants with hand-chosen sandstone and Preen pre-treated mulch for a complete weed-free season.

press to zoom
New Landscape
New Landscape

The rock in the middle was specifically chosen as a sitting rock.

press to zoom
New Landscape
New Landscape

UniLock retaining walls installed.

press to zoom
1/6
Landscape Projects
Drain Replacement
Drain Replacement

Cut asphalt to replace existing clogged 6" drain pipe.

press to zoom
Drain Replacement
Drain Replacement

Catch basin hole enlarge to 8" and new pipe tied in.

press to zoom
Backfill completed
Backfill completed

press to zoom
Drain Replacement
Drain Replacement

Cut asphalt to replace existing clogged 6" drain pipe.

press to zoom
1/21
Drainage Work
Hillside Before
Hillside Before

New home with excessive hill on front side. Dozer cut material from back of site, fill in, and grade.

press to zoom
Hillside During
Hillside During

Same hillside after filled and topped with topsoil.

press to zoom
Complete Yard Installation.  All done!
Complete Yard Installation. All done!

Prep sub-surface, remove unwanted growth and old sidewalks, grade and prep 200 yards of screened topsoil and Hydroseed.

press to zoom
Hillside Before
Hillside Before

New home with excessive hill on front side. Dozer cut material from back of site, fill in, and grade.

press to zoom
1/25
Rockhound Finish
Ernst Trail Addition
Ernst Trail Addition

Grading bike trail behind Ainsworth in Meadville. Grade to spec for all access and install culvert pipe.

press to zoom
Ernst Trail Bridge 2019
Ernst Trail Bridge 2019

Piers set previously. Bridge installation day with Lloyd Crane, haf.AST Dirtworks, and the FCRT trail crew.

press to zoom

press to zoom
Ernst Trail Addition
Ernst Trail Addition

Grading bike trail behind Ainsworth in Meadville. Grade to spec for all access and install culvert pipe.

press to zoom
1/8
Earnst Trail Bridge
Building Site Preparation
Building Site Preparation

Future site of the new Tamarack Armory in Meadville, PA.

press to zoom
Building Site Preparation
Building Site Preparation

Tamarack Armory after all site prep and new parking area installed.

press to zoom
Building Floor Raising
Building Floor Raising

Raised the floor 6" in this 300' long building for water improvements. Each load was set at entrance door and pushed inside. Final compaction with roller.

press to zoom
Building Site Preparation
Building Site Preparation

Future site of the new Tamarack Armory in Meadville, PA.

press to zoom
1/12
Building Site Prep